With the announcement of the signed contract with the Roads Department of the Ministry of Regional Development and Infrastructure of the Republic of Georgia for preparation of feasibility study and detailed design for the upgrading and modernization of "Kobuleti Bypass Road", we bring you more information about this project.
The existing two-lane Kobuleti bypass road starts from Shekvetili and ends at the Chakvi-Makhinjauri tunnels. The length of the road is 31.3 kilometers. Within the framework of the monitoring of the intensity of the roads, the current and prospective increase in the intensity of the bypass road of Kobuleti was highlighted. In order to moderately develop the road infrastructure plan, the Roads Department of the Ministry of Regional Development and Infrastructure of the Republic of Georgia decided to publish a tender for feasibility study and a detailed design for the modernization of Kobuleti bypass road into a state of the art 4-lane highway which Institut IGH branch office in Georgia was awarded.
Kobuleti bypass is a component of the European Route E70 East-West road. As a result of the construction of the mentioned road, transit traffic from Adjara coastal strip is carried out on the new road, which will contribute to the ecological health of the resorts and the full development of tourism in the region.