Total capacity: 688 MW Survey works and cooling tower remediation works CT2 (2015), Technical supervision and topographic supervision of structures (2016 – 2019), Situation assessment and development of a tower remediation study CT3 (2017 – 2018), Inspection of the condition and preparation of remediation study CT1 (2018 – ongoing).