{"id":12682,"date":"2024-11-18T14:10:00","date_gmt":"2024-11-18T14:10:00","guid":{"rendered":"https:\/\/www.igh.hr\/?p=12682"},"modified":"2025-01-15T15:19:59","modified_gmt":"2025-01-15T15:19:59","slug":"reconstruction-of-daruvar-spa","status":"publish","type":"post","link":"https:\/\/www.igh.hr\/hr\/reconstruction-of-daruvar-spa\/","title":{"rendered":"Po\u010dinje obnova Daruvarskih toplica"},"content":{"rendered":"<p>Daruvarske toplice su trenutno u procesu najve\u0107e rekonstrukcije u svojoj povijesti. Ukupna vrijednost projekta iznosi gotovo 20 milijuna eura, od \u010dega \u0107e 97,22% sredstava biti financirano putem europskih fondova iz <a href=\"https:\/\/planoporavka.gov.hr\/\" data-type=\"link\" data-id=\"https:\/\/planoporavka.gov.hr\/\">Nacionalnog plana oporavka i otpornosti.<\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.igh.hr\/wp-content\/uploads\/2024\/11\/daruvarske-toplice_2-1024x576.jpg\" alt=\"\" class=\"wp-image-12686\" srcset=\"https:\/\/www.igh.hr\/wp-content\/uploads\/2024\/11\/daruvarske-toplice_2-1024x576.jpg 1024w, https:\/\/www.igh.hr\/wp-content\/uploads\/2024\/11\/daruvarske-toplice_2-300x169.jpg 300w, https:\/\/www.igh.hr\/wp-content\/uploads\/2024\/11\/daruvarske-toplice_2-768x432.jpg 768w, https:\/\/www.igh.hr\/wp-content\/uploads\/2024\/11\/daruvarske-toplice_2-18x10.jpg 18w, https:\/\/www.igh.hr\/wp-content\/uploads\/2024\/11\/daruvarske-toplice_2.jpg 1536w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Institut IGH, d.d. je odabran za izvo\u0111a\u010da nadzora izgradnje i rekonstrukcije, dok gra\u0111evniske radove \u0107e izvoditi tvrtka Radnik d.d., koja je izabrana nakon javnog natje\u010daja. Planirano trajanje radova je 14 mjeseci, a cilj je zavr\u0161iti sve radove unutar tog roka dok \u0107e postoje\u0107i objekti ostati funkcionalni tijekom rekonstrukcije.<\/p>\n\n\n\n<p>Planirana je obnova 77 postoje\u0107ih smje\u0161tajnih jedinica, izgradnja 13 novih te pro\u0161irenje i modernizacija bazenskog kompleksa.  Posebna pozornost posvetit \u0107e se razvoju wellness ponude, koja \u0107e uklju\u010divati inovativne sadr\u017eaje poput pivskih kupki i kupki s hrastovim drvetom, po \u010demu \u0107e Daruvarske toplice postati jedinstvene u Hrvatskoj. Prostor za masa\u017ee, saune i terapijske tretmane bit \u0107e pro\u0161iren i opremljen najsuvremenijom opremom kako bi se zadovoljili najvi\u0161i standardi korisni\u010dkog iskustva.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"660\" height=\"367\" src=\"https:\/\/www.igh.hr\/wp-content\/uploads\/2024\/11\/daruvarske-toplice_1.jpg\" alt=\"\" class=\"wp-image-12687\" srcset=\"https:\/\/www.igh.hr\/wp-content\/uploads\/2024\/11\/daruvarske-toplice_1.jpg 660w, https:\/\/www.igh.hr\/wp-content\/uploads\/2024\/11\/daruvarske-toplice_1-300x167.jpg 300w, https:\/\/www.igh.hr\/wp-content\/uploads\/2024\/11\/daruvarske-toplice_1-18x10.jpg 18w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/figure>\n\n\n\n<p>Osim toga, izgradit \u0107e se turisti\u010dko- rekreacijski centar s fotonaponskom elektranom, \u010dime \u0107e se zna\u010dajno smanjiti tro\u0161kovi energije, procijenjeni na u\u0161tedu od 100 tisu\u0107a eura godi\u0161nje. Ova obnova simbolizira dugogodi\u0161nje planove za unapre\u0111enje infrastrukture i usluga koje pru\u017eaju Daruvarske toplice, \u010dime se podi\u017ee kvaliteta zdravstvenog turizma u regiji.<\/p>","protected":false},"excerpt":{"rendered":"<p>Daruvar Spa is currently undergoing the largest reconstruction in its history. The total value of the project amounts to nearly 20 million euros, 97.22% of which will be financed through European funds from the National Recovery and Resilience Plan. Institut IGH, d.d. has been selected as the construction supervision contractor, while the construction works will [&hellip;]<\/p>","protected":false},"author":7,"featured_media":12683,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12682","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/posts\/12682","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/comments?post=12682"}],"version-history":[{"count":4,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/posts\/12682\/revisions"}],"predecessor-version":[{"id":12691,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/posts\/12682\/revisions\/12691"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/media\/12683"}],"wp:attachment":[{"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/media?parent=12682"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/categories?post=12682"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/tags?post=12682"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}