{"id":11678,"date":"2019-09-26T00:00:00","date_gmt":"2019-09-26T00:00:00","guid":{"rendered":"https:\/\/igh.hr\/igh-contracted-for-supervision-works-during-reconstruction-of-the-water-supply-network-of-the-city-of-sarajevo\/"},"modified":"2019-09-26T00:00:00","modified_gmt":"2019-09-26T00:00:00","slug":"igh-contracted-for-supervision-works-during-reconstruction-of-the-water-supply-network-of-the-city-of-sarajevo","status":"publish","type":"post","link":"https:\/\/www.igh.hr\/hr\/igh-contracted-for-supervision-works-during-reconstruction-of-the-water-supply-network-of-the-city-of-sarajevo\/","title":{"rendered":"IGH anga\u017eiran na poslovima nadzora nad rekonstrukcijom vodovodne mre\u017ee grada Sarajeva"},"content":{"rendered":"<p>Institut IGH d.d. je u zajednici ponuditelja koju \u010dini s dru\u0161tvom IPSA Institut d.o.o. Sarajevo, s Kantonalnim javnim komunalnim preduze\u0107em Vodovod i kanalizacija d.o.o. Sarajevo (KJKP ViK), sklopio Ugovor za nadzor radova u okviru projekta \u201eSarajevo Water Project\u201c, u vrijednosti od 3.000.000 HRK.   <\/p>\n<p>Ugovor o nadzoru sklopljen je nakon provedenog postupka javne nabave sukladno procedurama Europske banke za obnovu i razvoj (EBRD), koja financira projekt, pri \u010demu vrijednost prve faze cjelokupnog projekta iznosi 10 milijuna EUR-a. <\/p>\n<p>Domagoj \u0160imunovi\u0107, direktor za me\u0111unarodna tr\u017ei\u0161ta, pripremu ponuda i ugovaranje u Institutu IGH, naglasio je kako sklopljeni ugovor predstavlja jo\u0161 jednu u nizu potvrda realizacije strate\u0161kog usmjerenja IGH prema osna\u017eivanju pozicije dru\u0161tva na me\u0111unarodnim tr\u017ei\u0161tima. <\/p>\n<p>O\u010dekivano trajanje izvr\u0161enja usluge stru\u010dnog nadzora iznosi 18 mjeseci, a provodit \u0107e se nad radovima rekonstrukcije vodovodne mre\u017ee grada Sarajeva, uklju\u010duju\u0107i i rekonstrukciju postoje\u0107ih crpnih stanica. Projekt je naveden kao \u201enulti prioritet\u201c Vlade Kantona Sarajevo, BiH.  <\/p>\n<p><em>Photo by Damir Bo\u0161njak<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Institut IGH d.d., as a part of a group of tenderers comprising the company IPSA Institut d.o.o. Sarajevo and the Cantonal Public Utility Company Vodovod i kanalizacija d.o.o. Sarajevo (KJKP ViK), concluded a Supervision of Works Contract under the Sarajevo Water Project, in the amount of HRK 3,000,000. The Supervision of Works Contract was concluded [&hellip;]<\/p>","protected":false},"author":1,"featured_media":11487,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-11678","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/posts\/11678","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/comments?post=11678"}],"version-history":[{"count":0,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/posts\/11678\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/media\/11487"}],"wp:attachment":[{"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/media?parent=11678"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/categories?post=11678"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.igh.hr\/hr\/wp-json\/wp\/v2\/tags?post=11678"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}