HYDROELECTRIC POWER PLANTS

Lešće Hydro Power Plant

  • Service:Design and review
  • Sector:Water engineering
  • PROJECT DURATION:
    / 2010
  • COUNTRY:
    Croatia

As a lead partner of a consortium, Institut IGH participated in development of the working design for the last hydro power facility constructed in the Republic of Croatia, HE Lešće on the Dobra River, completed in 2010.

Next reference

Landslide in Aleja Bologne, Zagreb